Layth A. Hasnawi. (2016). Study the effect of Programmed Partial Mainteanence on the Power factory Productivty in diyala company for electrical INDUSTRIES. Diyala Journal of Engineering Sciences, 9(1), 121–133. https://doi.org/10.24237/djes.2016.09110