Dhuha M. Dawood, Abd, A. M. ., & Zehawi, R. N. (2023). Forecasting Final Cost and Time Rates of Highway Construction Projects in Iraq Using Regression Analysis. Diyala Journal of Engineering Sciences, 16(4), 142–156. https://doi.org/10.24237/djes.2023.160412