[1]
H. Ali , M. and M. Abd, A. 2021. Using of an Artificial Neural Networks with Particle Swarm Optimization (ANN-PSO) Model in Prediction of Cost and Delay in Construction Projects. Diyala Journal of Engineering Sciences . 14, 3 (Sep. 2021), 78–93. DOI:https://doi.org/10.24237/djes.2021.14307.